Residence EV06 Phuket
Site visit update 05.09









Site visit/ construction update 23.03.09. Overall architecture is at 90% and possible schedule to be complete for exterior work by April/ May 2009. Interior contractor is appointed and will be able to commence work by Mid of April 2009. Best house in the world.

This is our favourite shot for the day. From this view, it appear exactly to our pre-visualised rendering presented in the Preliminary Design Stage. Stunning.

Swimming pool with partially side exposed. 20 mm tempered glass with support.

Another view point that meets with our anticipation.