Residence Phang Nga Natai Beach

25.09.09P1160766

P1160780P1160781P1160802P1160807P1160826P1160816P1160810The update on 31.07.09P1140269

they closed the pavillion for Air con. testingDSC_4364

 

 

The update on 26.06.09

 

entrance copyP1130880P1130868P1130798P1130777P1130806the pavillionP1130828P1130792P1130825P1130770 house B from the beach

 

 

 

The site updates on 21.05.09

R0017831R0017832R0017833R0017834R0017835R0017840R0017836R0017839R0017842R0017843R0017853R0017856R0017859

The site updates on 23.03.09.  About 80% progress reported.  Ceiling start to get in place with floor and wall finishing at 50%.  Everything should be 90% finish at the end of April except the outdoor wooden deck.  End of May completion is pursued.

r0017710

The stone wall is still uneven and needed to be re-finished on the surface

r0017725r0017724r0017723r0017722r0017721r0017720r0017719r0017717r0017718r0017716r0017715r0017714r0017713r0017712r0017711r0017709r0017708